List the air tools and machine stations, say how often each one actually runs, and get the CFM you need, a horsepower range, and a receiver tank to match. Then send it to us as a quote request in one click.
| Tool or station | CFM each | How many | Use % | Remove |
|---|
Use % is the share of the shift the tool is actually blowing air. Hand tools in a shop often run well under half the time; a machine that cycles all shift can be close to 100%.
Source: preset CFM values are typical ratings at 90 psig from air tool maker spec sheets. The tool's own data plate always wins. Demand = CFM x quantity x use %, the load-factor method in the US DOE / Compressed Air Challenge Sourcebook, "Improving Compressed Air System Performance".
Source: leak allowance per the DOE / Compressed Air Challenge Sourcebook leaks fact sheet: a well-kept system holds leaks under 10% of output, while many plants run 20% to 30%. Room to grow is your call, not a standard; we start at 20%.
Each row is CFM x how many x use %. A 5 CFM impact gun that runs 30% of the time
only needs 1.5 CFM on average. Adding up nameplate CFM alone oversizes the compressor.
Leaks come off the top of every system, so we add them on the tool demand. Room to grow is added on top of both, so next year's new station is already covered.
A good machine makes about 4 to 5 CFM per HP at 100 psi. We show both ends of that range, rounded up to the next standard motor size.
A receiver of 3 to 5 gallons per CFM evens out short bursts and keeps the compressor from starting and stopping too often.
Source: US DOE / Compressed Air Challenge, "Improving Compressed Air System Performance: A Sourcebook for Industry"; CAGI Performance Data Sheets; compressor maker sizing guides. This tool gives a starting size, not a system design. Pressure drop, dryers, and peak events can change the answer.
Send the result as a quote request. We'll check it against your actual load, suggest a machine, tank, and dryer, and come back with pricing.
Request a QuoteYour quote. We reply within one business day with pricing, lead-time, and configured parts.